Abstract
Before performing drastic changes to a project, it is worthwhile to thoroughly explore the available options within the current structure of a project. An alternative to drastic change are internal changes that adjust current options within a software project. In this paper, we show that the effects of numerous internal changes can out-weigh the effects of drastic changes. That is, the benefits of drastic change can often be achieved without disrupting a project.